Tunnel Formwork System
It is a steel formwork system that allows curtain and floor concrete to be poured simultaneously and the surfaces exposed to concrete are manufactured as sheet metal.
In addition, the Tunnel Formwork System is a system in which concrete can be poured 500 times depending on the conditions of use, mold costs are minimized, worker safety is maximized thanks to the scaffolding systems used, and one concrete can be poured every day.
Tunnel Formwork System is used in the production of monolithic residential, hospital, prison and dormitory type buildings. Thanks to this system, one layer of concrete can be poured every 2 days or every day, depending on the size of the building.
Structures produced with the Tunnel Formwork System are economical, earthquake resistant, where manufacturing errors are minimized and the cost of fine construction labor is greatly reduced.